Shard Place is a £30m project. It is a 27-storey residential building including 176 apartments.
263 prefabricated utility cupboards were manufactured at Halsion’s Prefabrication Unit in Kent along with all associated MEP services prior to being transported to site.
All the prefabricated utility cupboards incorporated the Apartments Heating and Cooling Interface unit, mechanical ventilation heat recovery units, the BMS control panel, the leak detection panel, the water softener and the electrical consumer unit.
Halsion also manufactured the soffit mounted services modules for 22 corridors, comprising of heating pipework, cooling pipework, boosted cold water, sprinkler pipework and electrical containment. The modules were delivered to site on bespoke trollies suitable to be transported to the floors in the site goods hoist.